Handley Surveys has been involved in major construction projects throughout Australia for the past 40 years. In the past 15 years Handley Surveys have focused on construction expansion projects for the Oil and Gas and Mining sectors, playing a major part in Australia’s biggest LNG and Mining projects. Specialised services tailored to client’s individual requirements and a wealth of technical knowledge position Handley Surveys as leaders in the industry for surveying services. A small sample of previous major projects is listed below.

APLNG

CB&I Constructors awarded Cimeco a $90 million contract for the Australia Pacific LNG project in Gladstone, Queensland. The scope included civil and concrete services associated with the installation of two LNG tanks for the project. Handley Surveys was awarded the contract to provides surveying service to the project.

Learn More >
Burrup Fertiliser

SNC-Lavalin awarded CB&I the mechanical erection package for the construction of two, 40,000t cryogenic, double-walled, double integrity tanks to be used for ammonia storage. CB&I were also tasked with the structural, mechanical and piping contract. Handley Surveys was selected to provide teams to both site operations.

Learn More >
Gas Power Stations

APA Group commissioned UGL Resource to build gas turbine compressor stations at Yarraloola and Paraburdoo sites for their existing infrastructure network expansion. Handley Surveys was awarded the work based on their high level of experience with rotating gas turbines and previous structural, mechanical and piping works.?

Learn More >
GORGON LNG

Handley Surveys was awarded a massive contract to provide all surveying services to the project, a huge milestone for the company.

Learn More >
Gorgon LNG Project

Downer EDI secured a $170 million contract for work on the Gorgon project on Barrow Island. The 12-month contract for the company is for miscellaneous works and includes an option for extension. Handley Surveys was selected to provide laser scanning and SMP surveying services to the project on Barrow Island and International fabrication yards.

Learn More >
KGP

The Karratha Gas Plant has an annual LNG production capacity of 16.3 million tonnes and includes five LNG processing trains, product load out facilities, LNG and condensate storage facilities as well as a domestic gas plant. Handley Surveys were engaged on the project to trial imaging hardware for clash detection and engineering design tasks.

Learn More >
MACEDON LNG

BHP Billiton undertook the US$1.5 billion Macedon wet gas pipeline and sales gas pipeline project in Onslow, awarding the $45 million engineering, procurement and construction (EPC) contract to Streicher-Clough JV. Handley Surveys was selected to provide surveying services to the project. The scope of work included horizontal directional drilling, construction of multiple pipelines and umbilical installation. Drawing upon a wealth of LNG experience, Handley Surveys ensured that the project was completed ahead of time and on budget.

Learn More >
NWS JV Phase IV LNG

CB&I awarded Handley Surveys the Structural, Mechanical and Pining surveying package for the assembly of the fourth LNG liquefaction train.

Learn More >
NWS JV Phase IV TOT

Woodside Petroleum Ltd awarded the $6 billion Engineering, Procurement and Construction (EPC) contract to Foster Wheeler Worley (FWW) for the onshore LNG liquefaction train and associated storage, offloading and ancillary facilities. The dimensional control and auditing surveying services were awarded to Handley Surveys for both module fabrication yard in Laem Chabang, Thailand and assembly site in Dampier, Western Australia. Handley Surveys ensured full separation of project roles and personnel to alleviate any conflict of interest on the project.

Learn More >
NWS JV PHASE V LNG

CB&I awarded Handley Surveys the Structural, Mechanical and Pining surveying package for the assembly of the fourth LNG liquefaction train.

Learn More >
Parker Point Diesel Tanks

Downer Tenix JV was the contractor for the construction of two 46-meter diameter diesel tanks. Handley Surveys was awarded a sub-contract survey package to provide civil and SMP surveyors to the project to assist with the construction phase. The award draws on Handley Surveys’s experience in the Pilbara region and experience operating with Rio Tinto on major projects.

Learn More >
Pluto

CB&I awarded Handley Survey to provide surveying services to the project based on their previous experience with large steel tank construction geometry.

Learn More >
PNG LNG

CB&I Clough JV selected Handley Surveys to execute civil and structural, mechanical and piping works on the project.

Learn More >
West Angelas Power Station

UGL is a market leader in the end-to-end engineering, asset management construction and maintenance services. UGL were awarded the contract to complete the West Angelas Power Station (WAPS). Handley Surveys was selected for the project based on their experience with Gas Turbine Generation projects and their ongoing relationship and outstanding performance with UGL Resources on previous projects.

Learn More >
WHEATSTONE LNG

The Wheatstone LNG project is one of Australia’s largest resource projects. The facility will include three onshore gas processing trains and domestic gas production plant. Handley Surveys was awarded an initial Early Works package by Bechtel to install the primary control network for the project. This package was later increased to supply all audit and additional EPC survey works for the project life.

Learn More >
Wheatstone LNG Project

Handley Surveys was awarded the Inside Battery Limit structural, mechanical and piping contract to assist with construction of the two LNG trains.

Learn More >