Project Background
Downer Tenix JV was the contractor for the construction of two 46-metre diameter diesel tanks. Handley Surveys was awarded a sub-contract survey package to provide civil and SMP surveyors to the project to assist with the construction phase. The award draws on Handley Survey’s experience in the Pilbara region and experience operating with Rio Tinto on major projects.
Project Details
Downer Tenix JV
2015
Karratha, WA
Project Objectives:
SMP
Key Achievements
0
%
Incident Free
0
ML
Diesel Tank Capacity
$
0
Contract Value