The Chevron operated Wheatstone LNG project was awarded to Bechtel Oil, Gas and Chemicals. The project is a grass-roots development at a Greenfields site near Onslow in Western Australia. Handley Surveys was awarded the Inside Battery Limit (ISBL) structural, mechanical and piping (SMP) contract to assist with construction of the two LNG trains.