Gas Power Stations

Project background

APA Group commissioned UGL Resource to build gas turbine compressor stations at Yarraloola and Paraburdoo sites for their existing infrastructure network expansion. Handley Surveys was awarded the work based on their high level of experience with rotating gas turbines and previous structural, mechanical and piping works.

UGL Resources
Gas Turbine Generators
$340k
SMP Works
LTI Free